Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the updraftplus domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/yinboliu/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-file-upload domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/yinboliu/public_html/wp-includes/functions.php on line 6114
SR 4026 – H & J International

Projects

Transportation

Bridge Design

  • Client: PennDot (5-0)

SR 4026, Section 01B, Replacement of Shartleville Road Bridge over Plum Creek, Berks Country, PA

The Shartleville Road Bridge project involved the replacement of an existing prestressed concrete adjacent beam bridge with a new adjacent PS box beam bridge and any associated roadway improvements. The bridge is located at about a half mile downstream of the State Route 4022 bridge which was also to be replaced at the same time. The existing bridge is classified as structurally deficient and functionally obsolete due to aging and deterioration, and substandard alignment and profile. The new bridge has a widened bridge deck, improved safety features with new guide rails and end terminals, improved hydrological opening and approach roadway drainage, etc. Land acquisition and utility relocation were both required and channel diversion was used during the bridge construction.   


Notice: ob_end_flush(): Failed to send buffer of zlib output compression (0) in /home/yinboliu/public_html/wp-includes/functions.php on line 5464