Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the updraftplus domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/yinboliu/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-file-upload domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/yinboliu/public_html/wp-includes/functions.php on line 6114
SR 4013 – H & J International

Projects

Transportation

Bridge Design, H&H Analysis and Storm Water Management

  • Client: PennDot (2-0)

SR 4013, Section A02, Bridge Replacement, Mifflin Country, PA

The project involved the replacement of an existing multi I-beam bridge with a new precast concrete box culvert and any associated roadway improvements.  The existing bridge is classified as structurally deficient and functionally obsolete due to aging and deterioration, and substandard alignment and profile.  The new structure will have the increased structure width and improved alignment as well as safety features and eliminating the current speed limit posting at the bridge.

The hydraulic and hydrological analysis and determination of the hydraulic opening of the bridge was an important aspect of the project. The analysis and design program; HEC-RAS; was used for the analysis and culvert design.


Notice: ob_end_flush(): Failed to send buffer of zlib output compression (0) in /home/yinboliu/public_html/wp-includes/functions.php on line 5464