Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the updraftplus domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/yinboliu/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-file-upload domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/yinboliu/public_html/wp-includes/functions.php on line 6114
Roadway and Highway Design Projects – H & J International

Roadway and Highway Design Projects

DRJTBC I-78 Open Lane Toll Design Build Project, PA & NJ

This project was a design-build project for the construction and installation of the open lane tolling facility on I-78 encompassing the Pennsylvania and New Jersey border for the Delaware River Joint Bridge Commission (DRJBC). The project encompasses the design and installation of a space frame with open lane tolling equipment, partial demolition of existing tall building structure, retrofitting and strengthening of the remaining existing toll building structure, design and installation of new sign structures, concrete pavement road repair and modification, drainage improvement, and the installation of road safety features.

PennDOT Route 202 Improvements, Montgomery & Chester Counties, PA

This project involved upgrading and improving approximately six miles of the State Route (S.R.) 0202 with the construction of two large interchanges of S.R. 0202/S.R. 0422 and S.R. 0202/S.R. 0076. The total investment for the project was about $260 million which was funneled into the construction of the two major interchanges, numerous new bridges, retaining walls, culverts and noise barriers as well as the rehabilitation or replacement of several existing bridges and culverts.


Notice: ob_end_flush(): Failed to send buffer of zlib output compression (0) in /home/yinboliu/public_html/wp-includes/functions.php on line 5464