Projects

transportation

Roadway and Highway Design

  • Client: The Delaware River Joint Bridge Commission (DRJBC)

Open Lane Tolling Design-Build Project

The project was a design-build project for the construction and installation of the open lane tolling facility on I-78 encompassing the Pennsylvania and New Jersey boundary for the Delaware River Joint Bridge Commission (DRJBC). The project as a whole encompassed the design and installation of a space frame with open lane tolling equipment, partial demolition of the existing tall building structure, retrofit and strengthening of the remaining existing toll building structure, design and installation of new sign structures, concrete pavement road repair and modification, drainage improvement, and the installation of road safety features.


Notice: ob_end_flush(): Failed to send buffer of zlib output compression (0) in /home/yinboliu/public_html/wp-includes/functions.php on line 5427