Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the updraftplus domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/yinboliu/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-file-upload domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/yinboliu/public_html/wp-includes/functions.php on line 6114
NBIS Bridge Inspection Projects – H & J International

NBIS Bridge Inspection Projects

PennDOT (6-0) State Bridge Quality Assurance Program, Districtwide, PA

HPC Bridge Inspectors were tasked with the bridge quality assurance program for bridge rating calculation, review and update for bridges in District 6-0.

NJDOT 36 State Bridge Safety Inspection, Statewide, NJ

HPC bridge inspectors conducted bridge safety inspection, non-destructive testing, maintenance and protection traffic, underwater inspection for the state of New Jersey. They utilized PONTIS for bridge ratings, asset management, reporting, and more.


Notice: ob_end_flush(): Failed to send buffer of zlib output compression (0) in /home/yinboliu/public_html/wp-includes/functions.php on line 5464