Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the updraftplus domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/yinboliu/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-file-upload domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/yinboliu/public_html/wp-includes/functions.php on line 6114
Education Facilities – H & J International

Education Facility Projects

New Jersey School Construction Authority, NJ K-8 Public School 28 and 29, New Brunswick, NJ

 As education is a key factor in many cities. schools are constantly being constructed and upgraded in order to help provide optimal learning conditions. This project involved providing engineering design services for the construction of two new K-8 public schools, public schools number 28 and 29, for the New Jersey Economic Development Authority (NJEDA). The project encompassed conceptual and schematic design, design development, construction documents, and construction services. The full architectural and engineering design services were conducted for any concepts in the following areas: architectural, structural, mechanical, electrical, civil, municipal service, etc.

NYC School Construction Authority, Staten Island Public School Extension, Staten Island, NYC 

This project involved the design and construction of four New York City public schools. One of the main components of the project was the expansion of the schools by incorporating modular classrooms at the existing school sites. The pre-engineering modular classrooms ranged in size from about 1000 to 1500 SF and were prefabricated at a manufacturer’s site, transported to be installed at the prepared sites of the existing school campuses. The design-build project consisted of all engineering design services for site developments, utility connections, structural and civil engineering design services, and construction support services and required coordination and corporation with the modular classroom manufacturer.


Notice: ob_end_flush(): Failed to send buffer of zlib output compression (0) in /home/yinboliu/public_html/wp-includes/functions.php on line 5464